Client Bell Labs . BCE Global Tech
Sector Technology . Global Capability Centre
Location Electronic City Phase 1, Bangalore
Size 80,000 SQ FT
Timeline 120 Days

BCE Global Tech didn't want a quiet engineering floor. They wanted a team that wanted to come in.

Bell Labs  .  BCE Global Tech case study

The Brief

BCE Global Tech needed a GCC floor that could attract and retain engineers in a competitive Bengaluru talent market. The brief asked for a design that put social infrastructure — the games room, the café, the informal collision zones — at the centre of the floor plan, not the corner. Engineering density had to be maintained. But the floor had to give engineers a reason to choose the office over working from home.

The Challenge

80,000 square feet across a constrained floor plate in Electronic City, with a 120-day build window running alongside an active phased hiring campaign. The social spaces could not feel bolted on — they had to be load-bearing in terms of culture.

What we designed

Designed to the five conditions of the Performance Climate.

terrain

Ground

Biophilic materiality throughout — natural wood, concrete and planted edges — so the floor felt grounded and tactile rather than corporate.

air

Air

Acoustic planning kept the social zone acoustically contained so it did not bleed into the adjacent engineering benching.

light_mode

Light

Floor-to-ceiling glazing runs along the collaborative zone, carrying daylight into the social core where occupancy is highest.

fork_right

Flow

The games, café and lounge zones are placed along the main circulation spine, so everyone passes through on the way in and out.

center_focus_strong

Focus

Engineering benching is set away from the social zone with a clear acoustic and visual break so heads-down work remains protected.

What we built

Custom joinery, the café counter, the acoustic slat wall and the games-zone furniture were manufactured in Jigani and installed in a single coordinated site sequence.

  • check_circle IN-HOUSE ACOUSTIC SLAT FEATURE WALL
  • check_circle CUSTOM CAFÉ COUNTER AND JOINERY
  • check_circle BRAND-COLOUR UPHOLSTERY SPECIFICATION
  • check_circle CNC-ENGINEERED GAMING ZONE ELEMENTS
Integrated Build Process
80,000 sft
DELIVERED IN 120 DAYS
format_quote
"When the floor is worth coming to, the occupancy figures take care of themselves. That is what integrated delivery buys you: a workplace your team chooses. "

BCE Global Tech

That is what integrated delivery buys you: a date you can build a business around.