Our Work.
Every project here was designed and built by one team. No handoffs. No excuses. Open any project to see how it came together.
BFSI . Global Capability Centre · 01 / 15
PNC
1,30,000 SQ FT
"PNC didn't want a banking floor. They wanted a workplace that didn't read like a bank."
View Case Study arrow_forward
Consumer . FMCG Corporate HQ · 02 / 15
ABInBev
48,000 SQ FT
"AB InBev didn't want an office. They wanted a stage their brand could perform on."
View Case Study arrow_forward
Consumer . Sports & Lifestyle Corporate HQ · 03 / 15
Puma
1,35,000 SQ FT
"Puma didn't want an office. They wanted a building that moved like the athletes inside it."
View Case Study arrow_forward
BFSI . Global Capability Centre · 04 / 15
CIBC Bank
1,30,000 SQ FT
"CIBC didn't want a bank office in India. They wanted their global standard, built in Hyderabad."
View Case Study arrow_forward
Professional Services · 05 / 15
Deloitte India
2,00,000 SQ FT
"Deloitte didn't want a corporate floor. They wanted a flagship that announced the firm's ambition."
View Case Study arrow_forward
Financial Technology . GCC · 06 / 15
Zelis
1,25,000 SQ FT
"Zelis didn't need a Hyderabad office. They needed their Hyderabad floor to feel like Zelis everywhere else."
View Case Study arrow_forward
Industrial Technology . Corporate Workplace · 07 / 15
Schneider Electric
2,00,000 SQ FT
"Schneider Electric didn't want a corporate Mumbai office. They wanted an industrial-heritage building that worked like a modern one."
View Case Study arrow_forward
Energy · 08 / 15
Baker Hughes
55,000 SQ FT
"Baker Hughes didn't want an oil-and-gas office. They wanted Energy Forward made into a place."
View Case Study arrow_forward
BFSI . Global Capability Centre · 09 / 15
HSBC Bank
2,00,000 SQ FT
"HSBC didn't want a bank's office. They wanted a workplace that read like HSBC and worked like a GCC."
View Case Study arrow_forward
Automotive · 10 / 15
Hero Motocorp
20,000 SQ FT
"Hero MotoCorp didn't want a corporate floor. They wanted a campus their team wanted to come back to."
View Case Study arrow_forward
E-Commerce & Technology · 11 / 15
Flipkart
20,000 SQ FT
"Flipkart didn't want a workplace. They wanted an experience their team could walk through."
View Case Study arrow_forward
Technology · 12 / 15
CGI
28,000 SQ FT
"CGI didn't want a tech floor. They wanted a workplace that made an arrival feel like an arrival."
View Case Study arrow_forward
Managed Spaces . Premium Flexible Workspace · 13 / 15
The Executive Centre
82,000 SQ FT
"TEC didn't want a managed-office floor. They wanted a hotel-grade members' club, built in seventy-five days."
View Case Study arrow_forward
Technology . Global Capability Centre · 14 / 15
Bell Labs . BCE Global Tech
80,000 SQ FT
"BCE Global Tech didn't want a quiet engineering floor. They wanted a team that wanted to come in."
View Case Study arrow_forward
Real Estate . Corporate HQ · 15 / 15
Grava . My Home Group
28,000 SQ FT
"My Home Group didn't want a sales office. They wanted a space that felt like the buildings they sell."
View Case Study arrow_forward
Scroll
01 / 15
Ready to start yours?
We manage every detail from the first sketch to the final brick. Your vision, executed without compromise.